Driveway Access Permit
Required to construct or modify a driveway connecting private property to a public roadway, ensuring safe sight distance and drainage.
WSDOT or Local Public Works Statewide 2–6 weeks
Standard Operating Procedure
- 1Step 1
Determine whether your access is to a state highway (WSDOT) or local road (city/county public works).
- 2Step 2
Submit the application with site plan and drainage details to the relevant agency.
- 3Step 3
An inspector reviews the location for sight distance, drainage, and safety standards.
- 4Step 4
The permit is issued with construction conditions; you schedule the work within the validity period.
- 5Step 5
A final inspection confirms the driveway meets standards before the permit is closed.